| This is where the meter will go when the final connection is made |
| Connecting to the main. They use a connector that is heat melted to the main. |
| Then a small line is connected which goes to the meter which is about 100' off the road. There are riser is installed to take the meter. |
| The small line runs from the road main to the meter. Then it's 2" pipe to the house |
| Large pipe exiting at the house. Riser is still to be installed on the house. |